Recognised by

Prerequisite programme review

Every programme checked for coverage, for evidence that it works, and for hazards sitting at the wrong level.

What is a prerequisite programme review?

A prerequisite programme review assesses the basic conditions and activities that maintain a hygienic environment across an operation, and checks whether each is documented, performed and verified. Prerequisites carry most of the hazard control in any food business, and the most common finding is a programme that is performed diligently with nothing recorded to prove it.

The hazard analysis leans on these programmes constantly. Hazards are dismissed as controlled by cleaning, by pest control, by hygiene. Each dismissal is only as good as the programme behind it, and the programme is only as good as the evidence that it works.

Summary

Coverage, verification evidence and the boundary between prerequisite and control point, assessed together. Delivered remotely or on site, in any language, quoted on scope.

Prerequisite review at a glance

Assessed against
Codex principles and your own standard
Standards
BRCGS, IFS, FSSC 22000, ISO 22000, SQF, customer codes
Covers
Premises, cleaning, pest, hygiene, maintenance, utilities, waste, storage
Tests
Whether each programme is evidenced, not only performed
Includes
PRP, OPRP and CCP boundary findings
Delivery
Remote, with site visits by arrangement
Output
Inventory, verification position, priority plan
Coverage
Worldwide

Prerequisite, operational prerequisite or control point

Getting this boundary wrong in either direction is serious, and both errors are common.

LevelWhat it controlsTypical examplesWhat it needs
Prerequisite programmeControls hazards across the operation generally.Cleaning, pest control, personal hygiene, maintenance, waste, utilities.Verified on a schedule, no critical limit, corrective action on the programme.
Operational prerequisiteControls a significant hazard where a critical limit is not practical.Zoning controls, air handling in high care, glass control on a specific line.Action criteria, planned monitoring, corrective action on product where relevant.
Critical control pointControls a significant hazard at a specific step.Cook temperature, metal detection, pH at a defined step.Measurable critical limit, monitoring every batch, immediate product decision.

The programmes assessed

Eight programme areas, each checked for coverage and for the evidence behind it.

Premises and layout

Fabrication, zoning, flows and the physical suitability of the building for what is made in it.

Cleaning and sanitation

Schedule, chemicals, method, validation of effectiveness and routine verification.

Pest control

Device mapping, frequency, trend analysis, proofing and contractor performance.

Personal hygiene

Health screening, hand washing, clothing, jewellery, and movement between areas.

Maintenance

Planned maintenance, hygienic release after work, temporary repairs and contractor control.

Utilities

Water quality and testing, compressed air, steam and ventilation, each verified against its use.

Waste management

Segregation, storage, removal frequency and the condition of external waste areas.

Storage and transport

Segregation, stock rotation, temperature control and the condition of vehicles.

Where prerequisite programmes fail

Eight failures, and the first is a frequent source of findings in this clause area.

What you receive

The verification position states plainly where a programme runs well and nothing proves it.

ElementWhat it covers
Programme inventoryEvery prerequisite programme your operation needs, with gaps identified.
Coverage assessmentEach programme checked against your standard and against your process.
Verification positionWhat proves each programme works, and where nothing does.
Boundary findingsHazards sitting at the wrong level, in either direction.
Frequency rationaleRisk based intervals with the reasoning recorded so they can be defended.
Hazard analysis linkWhich hazards each programme carries, cross referenced to the analysis.
Ownership and recordsA named owner and a record design for every programme.
Priority planFindings sequenced by consequence at audit and by risk to product.

Who a prerequisite programme review is for

Food manufacturers, processors, packers and catering businesses. It suits operations whose hazard analysis dismisses hazards on the basis of prerequisite control, which is almost all of them.

Prerequisite findings were raised at your last audit.

Programmes are performed well and nothing records that they work.

You have more CCPs than your process warrants.

A significant hazard is being managed inside a general programme.

Frequencies were set by convention with no rationale.

Programmes have no named owner.

Contractors run programmes and their records sit elsewhere.

Your hazard analysis references prerequisites that are not documented.

How the review is carried out

  • 1

    Inventory

    The programmes your operation needs are established from your process, your products and your standard.

  • 2

    Coverage

    Each existing programme is assessed for whether it covers what it claims and what your standard requires.

  • 3

    Verification

    What proves each programme works is examined, separately from what proves it was performed.

  • 4

    Boundary

    Hazards are checked for whether they sit correctly as a prerequisite, an operational prerequisite or a control point.

  • 5

    Frequency and ownership

    Intervals are justified against risk, and a named owner is assigned to each programme.

  • 6

    Plan

    Findings are sequenced by audit consequence and by risk to product, with record designs supplied.

Not included

Writing the programmes. Where a programme is missing entirely, documentation development covers building it.

Validation studies. Where a programme needs evidence it achieves what it claims, the review states what study is needed.

The plan itself. Hazard analysis, CCPs and critical limits are covered by a HACCP plan review.

What a prerequisite programme review costs

Every review is quoted against its own scope. A single unit catering operation and a multi zone manufacturing site are very different pieces of work. These factors set the price.

Number of PRPs in scope

Standard in scope

Site size

What this service is assessed against

These are the primary sources this work is built on. Where a market you sell into has its own requirement, that takes precedence and we assess against it.

CXC 1-1969, General Principles of Food Hygiene
The international reference for prerequisite programmes and for the seven HACCP principles. Codex Alimentarius
Regulation (EC) No 852/2004 on the hygiene of foodstuffs
The general hygiene requirements and the duty to operate procedures based on HACCP principles. EUR-Lex
ISO 22000:2018, food safety management systems
The management system requirements, including the distinction between operational prerequisite programmes and critical control points. ISO
BRCGS, IFS Food, FSSC 22000 and SQF published requirements
The clause your certification body audits against, which differs between schemes and between issues. BRCGS

Prerequisite terms

Prerequisite programme
A basic condition or activity necessary to maintain a hygienic environment suitable for producing safe food.
Operational prerequisite programme
A prerequisite identified by hazard analysis as essential to control a significant hazard where a critical limit is not practical.
Critical control point
A step at which control is essential to prevent, eliminate or reduce a significant hazard to an acceptable level.
Action criteria
A measurable or observable specification for an operational prerequisite, used where a critical limit is not appropriate.
Verification
Confirmation through methods other than monitoring that a programme achieves what it is intended to achieve.
Monitoring
Planned observation or measurement confirming that a control is operating as intended.
Codex Alimentarius
The international food standards body whose general principles of food hygiene underpin prerequisite requirements.
Hygienic release
Formal confirmation that equipment is fit to return to production after maintenance work.

Prerequisite programme questions

It is a basic condition or activity necessary to maintain a hygienic environment suitable for producing safe food. Cleaning, pest control, personal hygiene, maintenance, waste and utilities are the usual programmes. They control hazards across the operation generally instead of at one specific step.

A prerequisite programme controls hazards across the operation and is verified on a schedule. An operational prerequisite controls a significant hazard identified by hazard analysis where a measurable critical limit is not practical, using action criteria and planned monitoring. A critical control point controls a significant hazard at a step, with a measurable critical limit and an immediate product decision when it is breached.

Most often because they are performed and not evidenced. The work is done, done well, and nothing records that it happened or that it achieved anything. An unverified programme is treated as an absent one, however diligently it runs.

Monitoring asks whether the task was done. Verification asks whether it achieved what it was supposed to achieve. A completed cleaning checklist is monitoring. Swab results demonstrating the surface is clean are verification, and standards ask for both.

Designating cleaning or hygiene as a critical control point produces critical limits nobody can measure and corrective actions that make no sense against a batch. Where a prerequisite is carrying a significant hazard, an operational prerequisite is usually the right answer, and occasionally the hazard genuinely needs a control point at a step.

As many as your operation and your standard require. Most standards list the areas expected. What matters more than the count is that each programme covers what it claims to, has a named owner, and produces verification evidence.

On risk, with the reasoning recorded. Weekly because it has always been weekly attracts a finding even where weekly is the right interval, because standards examine the rationale and not the number.

They should, in both directions. The hazard analysis dismisses hazards on the basis of prerequisite control, so the prerequisite documentation needs to state which hazards it carries. Where that link is missing, neither document supports the other.

Pest control, hygiene, laundry and maintenance delivered by contractors are still your programmes. Records, competence evidence and the specification behind the service all have to be available to you, and contractor run programmes sitting outside the system is a frequent finding.

A named person, close enough to the work to know when it changes. Ownership by a department drifts and nobody is answerable when the verification quietly stops.

A HACCP plan review covers hazard analysis, CCPs, limits, monitoring and verification within the plan. This review covers the programmes underneath it, which is where most hazard control really sits and where most findings are raised.

A programme inventory with gaps, a coverage assessment against your standard, a verification position stating where nothing proves a programme works, boundary findings in both directions, a documented frequency rationale, the link to your hazard analysis, ownership and record design, and a priority plan.

Who carries out this work

Confi Food assigns work by subject. HACCP, labelling, certification standards, regulatory compliance, supplier assurance and monitoring are separate disciplines, and each piece goes to someone who works in that area. Every deliverable is reviewed internally by a second specialist before it reaches you.

Our technical positions are built from primary sources, meaning the legislation, the competent authority, Codex Alimentarius, the certification scheme owner or the relevant standards body. We set out how that works in our technical review and editorial policy, and what happens at each stage of an engagement in how Confi Food works.

Related services

Request a prerequisite review

Tell us the site, the process and the standard you work to, and receive a written quote covering the scope, the deliverable and the price.